HotDoodle Toolbar        
Cherry Glen Condo

Refinished Kitchen wood bar, cleaned and polished existing porcelain tile and grout joints. Installed new linoleum flooring in kitchen and bathrooms. Repaint all walls and ceilings. New carpet and wood baseboards. Master and guest baths remodeled.  Re-used cabinets and polished acrylic countertops. New insulation, sub-floor, and linoleum. Shower valves replaced. New upright shower pan, surround, and glass shower door in master bath. New tub, surround, and hotel shower curtain bar in guest bath. 

Previous Page Page 2 of 2 — 24 pictures in album  
IMG_3211

IMG_3302

IMG_3307

IMG_3409

Previous Page Page 2 of 2 — 24 pictures in album